23/01672/ADFULL

Status: Granted (25 Apr 2023)
Application Details
Description

Detailed drawings showing how the parts of the building which are to be kept during building works will be supported and protected during building works (North Block and South Block only); detailed design and construction method statements for all of the ground floor structures, foundations and basements and for any other structures below ground level, including piling, any other temporary or permanent installations and for site investigations which accommodate the location and of the Crossrail structures including temporary works and mitigate the effects on Crossrail, of ground movement arising from development (North Block and South Block only); and method statement to include arrangements to secure that, during any period when concurrent construction is taking place of both the permitted development and of the Crossrail structures and tunnels in or adjacent to the site of the approved development, the construction of the Crossrail structures and tunnels is not impeded (North Block and South Block only), pursuant to Conditions 11, 45 and 46 (respectively) of planning permission dated 19 April 2023 (RN: 22/04610/FULL) (PART APPROVAL - NORTH AND SOUTH BLOCKS ONLY)

Council

Westminster

Application Type

Approval of Details (Full PP)

Date Received

14 Mar 2023

Date Validated

14 Mar 2023

Decision Date

25 Apr 2023

Location
Address

Development Site Bound By Brook Street, Davies Street And South Molton Lane (excluding 58 Davies Street) And 10, 15-25, 27 And 42 South Molton Street London

Coordinates

51.513186555604989, -0.147952093154312

Source: Application Form

Quick Info
UID
23/01672/ADFULL
Reference
23/01672/ADFULL
Status
Granted
Last Updated
14 Jun 2025