Status: Granted
Application Details
Description

New 11Kva Over Headline spur in Ardroil, Isle of Lewis. This new line would consist of 2 new spans in total, for a length of approx. 120 Meters. The line would consist of 2 single poles and a total of 3 support stays, one on existing pole No.219 and two on the new pole No.2. The pole heights are documented below and the overhead line design is shown on the attached plan. The final single pole will have a 100KV Transformer installed on it and a section of underground Low Voltage cable then going from the base of the pole to the new Supply point. (approx. 30 mtrs)

Council

Western Isles

Application Type

Overhead Electricity Lines

Date Received

07 Jul 2025

Date Validated

07 Jul 2025

Location
Address

11Kva Overhead Line Spur Ardroil Uig Isle Of Lewis

Quick Info
UID
25/00245/OHL
Reference
Not Applicable
Status
Granted
Last Updated
12 Aug 2025