W/25/0761/HS2
Application Details
Description
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London ? West Midlands) Act 2017 for works comprising:Structures: Reinforced concrete overbridge jacked with wingwalls with a span of approximately 18m; structure accommodates two network rail tracks (the existing and a future provision for an additional track), robust kerb and concrete parapets. Including the provision of a safety guardrail and a pipe outlet headwall.Earthworks: The overbridge approach embankments are a reinstatement of the Coventry to Leamington Spa railway. Earthworks are approximately 21m in length with a maximum height of 1m to the north and 22m in length with a maximum height of 1.4m to the south. Fencing: Security fencing.
Council
Warwick
Application Type
HS2 applications
Date Received
29 May 2025
Date Validated
29 May 2025
Decision Date
22 Jul 2025
Council Website
View on Warwick websiteLocation
Address
Land at the existing Coventry to Leamington Spa railway approximately 300m south east of the A429 Kenilworth Road.
UPRN
Coordinates
52.361433124491732, -1.555947754135167
Source: Lat and Lng
Quick Info
- UID
- W/25/0761/HS2
- Reference
- W/25/0761/HS2
- Status
- Granted
- Last Updated
- 24 Jul 2025