2024/3544
Application Details
Description
EIA Scoping Consultation and Regulation 11 Notification for a Tertiary Treatment Facility with a peak output of 75Ml/d of recycled water; a recycled water drop shaft and approximately 4.5km pipeline with intermediate shafts located between Mogden Sewage Treatment Works and the River Thames upstream of Teddington Weir terminating in an outfall structure in or adjacent to the River Thames; a river water intake structure sized to abstract a maximum of 75Ml/d, located upstream of the outfall structure,a drop shaft, raw water pipeline and connection shaft to the Thames Lee Tunnel.
Council
Wandsworth
Application Type
Observations to Another Local Authority
Date Received
15 Oct 2024
Date Validated
06 Nov 2024
Decision Date
07 Nov 2024
Development Type
Not relevant (trees, conservation areas, etc)
Council Website
View on Wandsworth websiteLocation
Address
Teddington Direct River Abstraction (Site in Richmond)
Quick Info
- UID
- 2024/3544
- Reference
- 2024/3544
- Status
- Decided and closed
- Last Updated
- 15 Jun 2025