2024/3544

Status: Decided and closed (07 Nov 2024)
Application Details
Description

EIA Scoping Consultation and Regulation 11 Notification for a Tertiary Treatment Facility with a peak output of 75Ml/d of recycled water; a recycled water drop shaft and approximately 4.5km pipeline with intermediate shafts located between Mogden Sewage Treatment Works and the River Thames upstream of Teddington Weir terminating in an outfall structure in or adjacent to the River Thames; a river water intake structure sized to abstract a maximum of 75Ml/d, located upstream of the outfall structure,a drop shaft, raw water pipeline and connection shaft to the Thames Lee Tunnel.

Council

Wandsworth

Application Type

Observations to Another Local Authority

Date Received

15 Oct 2024

Date Validated

06 Nov 2024

Decision Date

07 Nov 2024

Development Type

Not relevant (trees, conservation areas, etc)

Location
Address

Teddington Direct River Abstraction (Site in Richmond)

Quick Info
UID
2024/3544
Reference
2024/3544
Status
Decided and closed
Last Updated
15 Jun 2025