Planning Applications
Council Reference Date Status Description
Selby ZG2025/0093/MAN2 28 Jan 2025 Granted Non material amendment of approval 2022/1482/S73 Section 73 application to vary condition 03 (discontinuance date) …
Selby ZG2024/1150/DOC 05 Nov 2024 Decided and closed Discharge of condition 13 (external lighting details) of approval 2022/1482/S73 Section 73 application to vary …
Selby ZG2024/0138/FUL 20 Feb 2024 Granted Installation of an underground water attenuation tank, drainage pipe and oil separator for the approved …
Selby ZG2024/0033/DOC 16 Jan 2024 Decided and closed Discharge of conditions 05 (landscaping) and 09 (drainage) of approval 2021/0789/FULM Construction of a zero-carbon …
Selby ZG2024/0017/DOC 10 Jan 2024 Decided and closed Discharge of conditions 4 (tree protection), 6 (construction management plan), 8 (visibility splays), 15 (noise …
Selby ZG2023/1357/DOC 21 Dec 2023 Decided and closed Discharge of condition 14 (materials) of planning permission 2022/1482/S73 Section 73 application to vary condition …
Selby ZG2023/1123/DOC 23 Oct 2023 Decided and closed Discharge of Conditions 11(Contamination), 12 (Remediation) and 13 (Verification) of approval 2021/0789/FULM Construction of a …
Selby ZG2023/0956/FUL 08 Sep 2023 Granted Installation of a revised access road layout and drainage connection pipe and a new fibre …
Selby ZG2023/0395/DOC 06 Apr 2023 Decided and closed Discharge of condition 10 (archaeology) of approval 2021/0789/FULM Construction of a zero-carbon energy storage and …
Selby 2023/0352/DOC 28 Mar 2023 Decided and closed Discharge of condition 19 (water main) of approval 2021/0789/FULM Construction of a zero-carbon energy storage …
Selby 2023/0313/MAN2 17 Mar 2023 Granted Non material amendment of 2021/0633/FULM Installation and operation of a battery storage facility and ancillary …
Selby 2022/1501/FUL 28 Feb 2023 Granted Installation of a grid connection cable route, drainage connection pipe and hydrant connection route for …
Selby 2023/0026/DOC 09 Jan 2023 Decided and closed Discharge of condition 10 (drainage strategy) of 2021/0633/FULM Installation and operation of a battery storage …