PA/26/00347/NC

Status: Granted
Application Details
Description

This development is proposed to be a phased development (phase 1: demolition, phase 2 construction) comprising: the demolition of the existing buildings, partial retention of the existing basement (including creation of a mezzanine) and construction of a new building for office use (Class E(g)), flexible office/community use (Class E(g)/F2), flexible cultural/event uses (Sui Generis) and flexible retail/service/food and beverage uses (Class E(a)-(c)); comprising a basement level, ground and 20 upper storeys plus roof plant level; creation of new public space and new pedestrian routes at ground level; hard and soft landscaping; pedestrian and vehicle access; blue badge car and cycle parking; ancillary servicing, plant and other back of house space; excavation to accommodate attenuation tank beneath existing basement slab, external alterations and demolition to the south elevation of the adjoining Porter Tun Room of the former Whitbread Brewery; associated highway works, enabling works and other works associated with the development.

Council

Tower Hamlets

Application Type

Observations to Other Authorities

Date Validated

25 Feb 2026

Location
Address

1 Silk Street, London, EC2Y 8AL

Postcode

EC2Y 8AL

Quick Info
UID
PA/26/00347/NC
Reference
PA/26/00347/NC
Status
Granted
Last Updated
09 May 2026