Suffolk - 2025
79 planning applications validated in 2025
79
Total
48
Granted
1
Refused
All Applications
| Reference | Address | Description | Status | Date Validated |
|---|---|---|---|---|
| SCC/0104/25/DoR/EA1N | East Anglia ONE North Offshore Wind Farm | Requirement 16 (1) Access Management Plan, Requirement 19 (1) Pre-commencement archaeology execution plan, Requirement 20(1) … | Granted | 30 Jul 2025 |
| SCC/0105/25/DoR/EA2 | East Anglia TWO Offshore Wind Farm | Discharge of Requirement 16 (1) Access Management Plan, Requirement 19 (1) Pre-commencement archaeology execution plan, … | Granted | 30 Jul 2025 |
| SCC/0124/23IP/ART27c6 | Endeavour House, 8 Russell Road, Ipswich, Suffolk, IP1 2BX | Discharge of condition 6. Post Completion Assessment for planning permission SCC/0124/23IP | Granted | 28 Jul 2025 |
| SCC/0091/25SE | Horringer Court Middle School Glastonbury Road Bury St Edmunds IP33 … | Erection of a children’s care home (Use Class C2), including car parking, access and other … | Pending | 24 Jul 2025 |
| SCC/0052/21SC/A27c5 | Pitfield, Butchers Road, Kelsale cum Carlton, IP17 2PG. | Discharge of Condition 5 (Planting) for planning permission SCC/0052/21SC. | Granted | 22 Jul 2025 |
| SCC/0012/24W/ART27c3&7 | Elizabeth House 10 Grange Road Beccles NR34 9NR | Discharge of condition 3. Notification of commenment and 7. External materials. For planning permission SCC/0012/24W | Granted | 17 Jul 2025 |
| SCC/0102/25/DoR | Bramford to Twinstead | The National Grid (Bramford to Twinstead Reinforcement) Order 2024: Formal Submission to discharge Schedule 3, … | Granted | 16 Jul 2025 |
| SCC/0099/25/DoR/EA1N | East Anglia ONE North Offshore Wind Farm | Discharge of Requirement 19(1) Pre-commencement archaeology execution plan, Requirement 20(1) Archaeology and Requirement 32(1)PRoW Strategy … | Pending | 11 Jul 2025 |
| SCC/0100/25/DoR/EA2 | East Anglia TWO Offshore Wind Farm | Discharge of Requirement 19(1) Pre-commencement archaeology execution plan, Requirement 20(1) Archaeology and Requirement 32(1)PRoW Strategy … | Pending | 11 Jul 2025 |
| SCC/0072/16W/VOC | Gisleham Brick & Pipeworks Brickworks Lane Gisleham Suffolk NR33 8DS | Variation of Conditions 6 (Limits of extraction), 39 (Restoration), 43 (Aftercare) and 44 (Aftercare) of … | Granted | 09 Jul 2025 |
| SCC/0095/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 35 : Highways Works (Works No. 10b) Southern Park & Ride. | Granted | 03 Jul 2025 |
| SCC/0057/25FH/SCREEN | Land between Isleham Water Recycling Centre and Mildenhall Water Recycling … | EIA Screening Opinion Request for the Installation of a new 5.07km foul rising main pipeline. | Unknown | 01 Jul 2025 |
| SCC/0090/22IP/ART27c7 | Land between Bramford Rd and Europa Way, (New Link Road) … | Discharge of Condition 7. Surface Water Drainage. For planning permission SCC/0090/22IP | Granted | 01 Jul 2025 |
| SCC/0092/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 23 – Main Development Site: Highway Works No. 1C (Leiston Drain Bridleway … | Pending | 25 Jun 2025 |
| SCC/0053/25MS | Malting Farm, Great Blakenham, Suffolk, IP6 0LX | Retrospective application for the change of use of land to enable the expansion of the … | Pending | 23 Jun 2025 |
| SCC/0058/25MS | Stowmarket High School, Onehouse Road, Stowmarket, Suffolk, IP14 1QR | Construction of new teaching block to accommodate 300-place expansion and conversion of sixth form block … | Granted | 10 Jun 2025 |
| SCC/0094/22B/ART27c5 | Pumping Station A Land off Holly Lane Belstead IP8 3LZ | Discharge of Condition 5. Soft Landscaping. For planning permission SCC/0094/22B | Pending | 06 Jun 2025 |
| SCC/0094/23MS/ART27c10,12&15 | Thurston Community College, Norton Road, Thurston, Suffolk, IP31 3PB | Discharge of Conditions 10. Vehicular access, 12. EV charging infrastructure and 15. Construction Management Plan … | Granted | 06 Jun 2025 |
| SCC/0069/25F | Cavenham Quarry, Cavenham Road, Cavenham, Bury St Edmunds, Suffolk, IP28 … | Erection and use of a concrete batching plant and associated infrastructure including access onto the … | Pending | 05 Jun 2025 |
| SCC/0087/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 35: Highways Works No. 11 Two Village Bypass | Unknown | 05 Jun 2025 |
| SCC/0085/25/DoR | Bramford to Twinstead | The National Grid (Bramford to Twinstead Reinforcement) Order 2024: Schedule 3, Requirement 11(1) – Access … | Refused | 04 Jun 2025 |
| SCC/0086/25IP/PreApp | Beacon House, Ipswich | Pre-Application - Changes to doors on front facade | Unknown | 03 Jun 2025 |
| SCC/0083/25/DoR/EA2 | East Anglia TWO Offshore Wind Farm | Discharge of Requirement 19(1) Pre-commencement archaeology execution plan and Requirement 20(1) Archaeology for the SI … | Granted | 02 Jun 2025 |
| SCC/0082/25/DoR/EA1N | East Anglia ONE North Offshore Wind Farm | Discharge of Requirement 19(1) Pre-commencement archaeology execution plan and Requirement 20(1) Archaeology for the SI … | Granted | 02 Jun 2025 |
| SCC/0080/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 10 Project Wide PRoW Implementation Plan - Two Village Bypass | Unknown | 30 May 2025 |
| SCC/0077/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 35: Associated Development Highways Works - Yoxford Roundabout (Works No.14) Construction Drainage. | Granted | 27 May 2025 |
| SCC/0076/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 35 Associated Development Highways Works No. 11 TVB (Friday Street Roundabout) | Unknown | 27 May 2025 |
| SCC/0073/25/DoR | Bramford to Twinstead | The National Grid (Bramford to Twinstead Reinforcement) Order 2024: Schedule 3, Requirement 4(1)(c) – Construction … | Unknown | 27 May 2025 |
| SCC/0020/25MS | Thurston Church of England Primary Academy, Pond Field Road, Thurston, … | Construction of new stand-alone 210-place teaching block and 30-place extension to existing pre-school with associated … | Pending | 22 May 2025 |
| SCC/0072/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 3 - Project Wide: Archaeology and Peat, Main Construction Area Mitigation Strategy … | Unknown | 21 May 2025 |
| SCC/0089/24MS/NMA | Former Stowmarket Fire Station, Lockington Road, Stowmarket, IP14 1BQ. | Non-Material Amendment to Planning Application reference SCC/0089/24MS to alter the method of demolition of the … | Granted | 20 May 2025 |
| SCC/0064/25/DoR/EA1N | East Anglia ONE North Offshore Wind Farm | Discharge of Requirement equipment 33 Emergency Planning Arrangements, onshore works phase, in respect of Scottish … | Granted | 13 May 2025 |
| SCC/0065/25/DoR/EA2 | East Anglia TWO Offshore Wind Farm | Discharge of Requirement equipment 33 Emergency Planning Arrangements, onshore works phase, in respect of Scottish … | Granted | 13 May 2025 |
| SCC/0060/25B | Lavenham Primary School, Barn Street, Lavenham, CO10 9RB. | Infilling of a wall in order to add an additional teaching space. | Pending | 29 Apr 2025 |
| SCC/0061/25FH/SCREEN | Cavenham Quarry, Marston's Pit, Cavenham Heath, Cavenham, Bury St. Edmunds, … | EIA Screening request for the installation and operation of a ground mounted solar array and … | Unknown | 28 Apr 2025 |
| SCC/0063/25IP/PreApp | Murrayfield Primary Academy Nacton Road, Ipswich IP3 9JL | Structural repairs to boundary wall and refurbish and re-design EYFS area | Unknown | 25 Apr 2025 |
| SCC/0011/24W/ART27c6 | Ashby House, 44 Pakefield Road, Lowestoft, NR33 0HU. | Discharge of Condition 6 (Post Construction Tree Survey) of planning permission SCC/0011/24W. | Granted | 17 Apr 2025 |
| SCC/0055/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 23: MDS Highways Work No. 1a(gg) temporary junction onto Valley Road, 1a(hh) … | Granted | 08 Apr 2025 |
| SCC/0028/25FH | Mildenhall College Academy, Mildenhall Hub, Sheldrick Way, Mildenhall, Suffolk, IP28 … | Erection of a three-storey extension to the existing academy building to accommodate current shortfalls for … | Granted | 01 Apr 2025 |
| SCC/0052/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of requirement 10: Project Wide Public Rights of Way - MDS Roads Bridleway (inc … | Unknown | 31 Mar 2025 |
| SCC/0054/25MS/SCOPE | Barham Quarry, Sandy Lane, Barham, Ipswich, IP6 0PB | EIA Scoping Request for an extension to the quarry workings in a southerly direction and … | Unknown | 28 Mar 2025 |
| SCC/0045/25FH/SCREEN | Gazeley Rail Depot, Higham, Kentford, Newmarket, Suffolk, CB8 7QT | Screening Opinion for the establishment and use of a replacement aggregates storage system, a coated … | Unknown | 25 Mar 2025 |
| SCC/0102/21F/ART27c23 | Cavenham Quarry, Marston's Pit, Cavenham Heath Cavenham, Bury St Edmunds, … | Partial discharge of condition 23 (parts a-f). Implementation of program of archaeological work | Unknown | 25 Mar 2025 |
| SCC/0041/23FH/A27c18,27,28,29 | Land off Station Road, Lakenheath IP27 9JE | Discharge of Conditions 18. Facing Materials; 27. Construction Management Plan; 28. Control of Construction Dust … | Granted | 20 Mar 2025 |
| SCC/0046/25/DoR/EA1N | East Anglian One North Offshore Wind Farm | Requirement 19(1) Pre-commencement archaeology execution plan, Requirement 20(1) Archaeology and Requirement 16(1) Access Management Plan … | Granted | 19 Mar 2025 |
| SCC/0047/25/DoR/EA2 | East Anglian Two Offshore Wind Farm | Requirement 19(1) Pre-commencement archaeology execution plan, Requirement 20(1) Archaeology and Requirement 16(1) Access Management Plan … | Granted | 19 Mar 2025 |
| SCC/0006/25IP | Northgate Sports Centre, Sidegate Lane West, Ipswich, IP4 3DJ. | The installation of replacement lighting columns and lighting around the athletics track & the MUGA. | Pending | 19 Mar 2025 |
| SCC/0023/25B | Brantham Hall Farm, Brantham, Suffolk, CO11 1PT | Construction of an agricultural irrigation reservoir with incidental extraction of mineral (partly retrospective) | Granted | 18 Mar 2025 |
| SCC/0042/25/DoR | East Anglia ONE North Offshore Windfarm | DCO Requirement 28 (1) (a) - Construction Traffic Management Plan - Substations Haul Road Stage | Granted | 14 Mar 2025 |
| SCC/0041/25/DoR | East Anglia TWO Offshore Windfarm | DCO Requirement 28 (1) (a) - Construction Traffic Management Plan - Substations Haul Road Stage | Granted | 14 Mar 2025 |
| SCC/0036/25/DoR | East Anglia ONE North Offahore Windfarm | DCO Requirement 22 (2(a)) - Surface Water Drainage Management Plan - Sub Stations Haul Road … | Granted | 13 Mar 2025 |
| SCC/0012/24W/A27c4and8 | Elizabeth House 10 Grange Road Beccles NR34 9NR | Discharge of Conditions 4: Soft landscaping scheme and 8: Details relating to the location, appearance, … | Granted | 13 Mar 2025 |
| SCC/033/25/DoR | East Anglia TWO Offshore Windfarm | Public Rights of Way Strategy DCO Requirement 32 (1) - Substations Haul Road Strategy | Pending | 13 Mar 2025 |
| SCC/0038/25/DoR | East Anglia ONE North Offshore Windfarm | DCO Requirement 28 (1) (b) - Travel Plan - Substations Haul Road Stage | Granted | 13 Mar 2025 |
| SCC/0035/25/DoR | East Anglia TWO Offshore Windfarm | DCO Requirement 22 (2(a)) - Surface Water Drainage Management Plan - Sub Stations Haul Road … | Granted | 13 Mar 2025 |
| SCC/0037/25/DoR | East Anglia TWO Offshore Windfarm | DCO Requirement 28 (1) (b) - Travel Plan - Substations Haul Road Stage | Granted | 13 Mar 2025 |
| SCC/0039/25/DoR | East Anglia TWO Offshore Windfarm | DCO Requirement 16 (1) Access Management Plan - Substations Haul Road Stage | Granted | 13 Mar 2025 |
| SCC/0040/25DoR | East Anglia ONE North Offshore Windfarm | DCO Requirement 16 (1) Access Management Plan - Substations Haul Road Stage | Pending | 13 Mar 2025 |
| SCC/0033/25/DoR | East Anglia TWO Offshore Windfarm | Public Rights of Way Strategy DCO Requirement 32 (1) - Substations Haul Road Strategy | Granted | 13 Mar 2025 |
| SCC/0040/25/DoR | East Anglia ONE North Offshore Windfarm | DCO Requirement 16 (1) Access Management Plan - Substations Haul Road Stage | Granted | 13 Mar 2025 |
| SCC/0012/24W/A27c6 | Elizabeth House 10 Grange Road Beccles NR34 9NR | Discharge of Condition 6 - Arboricultural Impact Assessment and Method Statement of permission SCC/0012/24W | Granted | 13 Mar 2025 |
| SCC/0034/25/DoR | East Anglia ONE North Offshire Windfarm | Public Rights of Way Strategy DCO Requirement 32 (1) - Substations Haul Road Strategy | Granted | 13 Mar 2025 |
| SCC/0090/22IP/A27c13 | Land between Bramford Rd and Europa Way, (New Link Road) … | Discharge of Condiiton 13 - Post construction Tree Safety Inspeciton / Report of permission SCC/0090/22IP | Granted | 11 Mar 2025 |
| SCC/0024/25SC | Melton County Primary School Melton Road Melton IP12 1PG | Provision of a purpose-built standalone block to the rear of the main school building for … | Granted | 06 Mar 2025 |
| SCC/0009/25IP | Car Parking At Beacon House White House Road Ipswich IP1 … | Installation of a solar canopy on non-domestic, off-street parking | Decided and closed | 06 Mar 2025 |
| SCC/0124/23IP/ART27c4,8 | Endeavour House, 8 Russell Road, Ipswich, Suffolk, IP1 2BX | Discharge of conditions 4. Tree Protection and 8. Aftercare for planning permission SCC/0124/23IP | Granted | 05 Mar 2025 |
| SCC/0025/25/DoR | Sizewell C Nuclear Power Station and Associated Development Sites | Discharge of Requirement 35 Highways Works Northern Park & Ride (Works No.9(b)). | Granted | 03 Mar 2025 |
| MS/2342/15/VOC2 | Gallows Hill Quarry, Ipswich Road, Baylham, Suffolk, IP6 0PF | Variation of conditions 1, 2, 10, 37, 38, 39, 40, 43, 44, 45 and 46 … | Pending | 03 Mar 2025 |
| SCC/0026/25/DoR/EA1N | East Anglian One North Offshore Wind Farm | East Anglia ONE North - DCO Requirement 22 (2)(b) Flood Management Plan - Substations Haul … | Granted | 27 Feb 2025 |
| SCC/0027/25/DoR/EA2 | East Anglian Two Offshore Wind Farm | East Anglia TWO - DCO Requirement 22 (2)(b) Flood Management Plan Substations Haul Road Stage | Granted | 27 Feb 2025 |
| SCC/0041/23FH/A27c5,6,9,10,13,19 | Land off Station Road, Lakenheath, IP27 9JE | Discharge of Conditions 5. Supervising Arboriculturalist; 6. Arboricultural Impact Assessment; 9. Biodiversity; 10. Construction Environment … | Granted | 27 Feb 2025 |
| SCC/0017/25SE | Haverhill Waste Management Site, Falconer Road, Haverhill, Suffolk, CB9 8QE | Retrospective application for the construction of a Materials Recovery Facility (MRF) and associated infrastructure. | Pending | 18 Feb 2025 |
| SCC/0024/21MS/ART27c14,15,23,25 | Masons Landfill Site Bramford Road Great Blakenham IP6 0JX | Discharge of Condition 14. Provision of newt ponds; 15. Landscape management; 23. Ecological restoration and … | Granted | 17 Feb 2025 |
| APP/V3500/C/25/3358643 | Land west of Falconer Road, Haverhill, Suffolk. | Appeal under Section 174 by Widdington Recycling Limited for the alleged breach of planning control … | Decided and closed | 05 Feb 2025 |
| SCC/0059/19MS/ART27c20,21,22-2025 | Great Blakenham Energy from Waste Site, Lodge Lane, Great Blakenham, … | Submission of information in respect of conditions 20 (Waste Capacity), 21 (CHP Opportunities) & 22 … | Granted | 29 Jan 2025 |
| SCC/0077/23MS/ART27c3,5,8 | Stowmarket Library, Milton Road North, Stowmarket, IP14 1EX. | Discharge of Conditions 3 (Archaeology), 5 (Landscaping), and 8 (Facing Materials) of planning permission SCC/0077/23MS. | Granted | 24 Jan 2025 |
| SCC/0113/24MS | Masons Landfill Site Bramford Road Great Blakenham IP6 0JX | Retrospective application for the erection and operation of Material Recycling Facility, provision of access road … | Granted | 21 Jan 2025 |
| SCC/0119/24SE | Horringer Court Middle School Glastonbury Road Bury St Edmunds IP33 … | Alteration of existing school buildings to provide new primary and secondary education facilities | Granted | 09 Jan 2025 |
| SCC/0004/25FH/SCREEN | Land at Cavenham Quarry, Cavenham Road, Tuddenham, Bury St Edmunds, … | EIA Screening request for the erection and use of a concrete batching plant and associated … | Decided and closed | 09 Jan 2025 |