2025/4384/HS2
Application Details
Description
PACKAGE 1 R1 – TURWESTON TO RADSTONE. A request for the approval of Plans and Specifications for the following works under Schedule 17 to the High Speed Rail (London – West Midlands) Act 2017. These work include; Turweston Viaduct (Part of) and associated earthworks, Helmdon Embankment, Brackley South Cutting (Part of), A43 Oxford Road Overbridge and associated earthworks, Bridleway AX16 Accommodation Overbridge and associated earthworks, Footpath AX15 Green Overbridge and associated earthworks, 2 No. Drainage Ponds, Drainage Ditches, 1 No. Flood Compensation Area, Earthworks associated with the realigned Bridleway AX14 and Footpath BD8, Earthworks associated with the GSMR Compound, Earthworks associated with the Whitefield Auto Transformer Station (ATS) Compound, Earthworks required to an approved Access Track and to create 1 No. new Access Track, Vehicle Restraint Bund, 2 No. Ancillary Culverts (above ground elements only), 3 No. Line Side Steps (Access Stairs), 3 No. Minor Ditch Crossings (Slab Crossings), Noise Barriers, Location of the Vehicle Restraint Barriers and Location of the permanent (security and boundary) fencing.
Council
South Northamptonshire
Application Type
HS2 Sch17 Approval plans and specifications
Date Received
27 Oct 2025
Date Validated
27 Oct 2025
Council Website
View on South Northamptonshire websiteLocation
Address
The site is located to the north east of Turweston and extends in a north westerly direction to the south of Radstone. The site crosses the A43 Oxford Road.
Coordinates
52.048590612618661, -1.133679616970374
Source: Application Form
Quick Info
- UID
- 2025/4384/HS2
- Reference
- 2025/4384/HS2
- Status
- Granted
- Last Updated
- 12 Feb 2026