PL/2024/01233/HS2DIS

Status: Granted (15 Oct 2024)
Application Details
Description

Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising a three span accommodation overbridge approximately 59.6m in length and 6.25m in width that crosses the HS2 rail line, Earthworks around the abutments of the overbridge to fully conceal the concrete pile caps and tie the overbridge into the cutting slopes, Minor earthworks at either end of the overbridge to tie into the existing landscape, Minor earthworks to facilitate the realignment of Footpath M186, farm access roads and to create a new V-shaped ditch which is approximately 30.65m in length, 750mm deep with a side slope gradient of 1.2, and four vehicle restraint systems VRS approximately 0.75m high.

Council

Solihull

Application Type

HS2 Section 17 (DIS)

Date Received

26 Jun 2024

Date Validated

26 Jun 2024

Decision Date

15 Oct 2024

Location
Address

West Of Burton Green Adjacent To An Existing National Grid Substation (Berkswell).

Quick Info
UID
PL/2024/01233/HS2DIS
Reference
PL/2024/01233/HS2DIS
Status
Granted
Last Updated
16 Oct 2024