PL/2024/00338/HS2DIS
Application Details
Description
Plans and Specifications submission under Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 for works comprising: Earthworks relating to: Railway embankment (Beechwood Embankments) including engineering earthworks, landscape earthworks and retaining walls; a network of maintenance access strips; the realignment of Kenilworth Greenway; the realignment of an existing watercourse; construction of four drainage ditches; 2m cascades and three balancing ponds. Structures comprising retaining wingwalls serving Carol Green Rail Underbridge and drainage wingwalls and three culverts with wingwalls: Lanscombe Culvert at 54.5m in length; Truggist Culvert at 43.5m in length; and Beechwood Culvert at 114.1m in length; handrails (approximately 1.08m in height) above the culvert; and noise barriers between 2m - 4m in height (from top of rail). Security Fencing (1.8m in height) and boundary fencing (1.4m in height). Pedestrian access to the railway line: maintenance access staircase.
Council
Solihull
Application Type
HS2 Section 17 (DIS)
Date Received
21 Feb 2024
Date Validated
21 Feb 2024
Decision Date
27 Jan 2025
Council Website
View on Solihull websiteLocation
Address
Land Northwest Of B4101 Waste Lane And Southeast Of Berkswell Station
Quick Info
- UID
- PL/2024/00338/HS2DIS
- Reference
- PL/2024/00338/HS2DIS
- Status
- Granted
- Last Updated
- 28 Jan 2025