Blank Field

Status: Granted (26 Apr 2023)
Application Details
Description

The proposed project is likely to include up to 307 wind turbine generators and associated support structures and foundations, with a maximum rotor blade diameter expected to be no greater than 310 metres, a maximum blade tip height of 355m above lowest astronomical tide and a minimum blade tip of 37m above LAT

Council

Scottish Borders

Application Type

Section 36 Application

Date Received

04 Jan 2023

Date Validated

05 Jan 2023

Decision Date

26 Apr 2023

Location
Address

Berwick Bank Offshore Wind Farm East Of St Abbs Head St Abbs Scottish Borders

Coordinates

56.320241537642936, -1.647085609930607

Source: Lat and Lng

Quick Info
UID
23/00007/S36
Reference
Blank Field
Status
Granted
Last Updated
30 Apr 2023