https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010103
Application Details
Description
The Net Zero Teesside Project. A full chain carbon capture, utilisation and storage (‘CCUS’) project, comprising a CO2 gathering network, including CO2 pipeline connections from industrial facilities on Teesside to transport the captured CO2 (including the connections under the tidal River Tees); a combined cycle gas turbine (‘CCGT’) electricity generating station with an abated capacity up to circa 860 MW of low carbon electricity, cooling water, gas and electricity grid connections and CO2 capture; a CO2 gathering/booster station to receive the captured CO2 from the gathering network and CCGT generating station; and the onshore section of a CO2 transport pipeline for the onward transport of the captured CO2 to a suitable offshore geological storage site in the North Sea.
Council
NIP
Application Type
Generating Stations
Date Received
19 Jul 2021
Date Validated
16 Feb 2024
Council Website
View on NIP websiteLocation
Address
Land at and in the vicinity of Teesworks, Redcar, Teesside, TS10 5QW
Postcode
TS10 5QW
Coordinates
54.609010000000000, -1.108484000000000
Source: Postcode Field
Quick Info
- UID
- https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/EN010103
- Status
- Unknown
- Last Updated
- 07 Nov 2025