23/00519/S37

Status: Granted (16 Aug 2023)
Application Details
Description

New electric line installed above ground with a voltage of 132 kV or more between Rothes III Wind Farm on-site substation, and Blackhillock substation at Keith. Two sections of underground cable (UGC) are anticipated. The first is at the western end of the connection for approximately 500 m as it would leave Rothes III Wind Farm on-site substation. The second section of UGC is on final approach to the connection point at Blackhillock substation in the east (1080m in length) - both permitted development.

Council

Moray

Application Type

Section 37 SE Energy Consent Unit

Date Received

27 Mar 2023

Date Validated

03 Apr 2023

Decision Date

16 Aug 2023

Council Website
View on Moray website
Location
Address

Elchies (RothesIII) Wind Farm

Quick Info
UID
23/00519/S37
Reference
23/00519/S37
Status
Granted
Last Updated
09 Sep 2023