23/00519/S37
Status: Granted
(16 Aug 2023)
Application Details
Description
New electric line installed above ground with a voltage of 132 kV or more between Rothes III Wind Farm on-site substation, and Blackhillock substation at Keith. Two sections of underground cable (UGC) are anticipated. The first is at the western end of the connection for approximately 500 m as it would leave Rothes III Wind Farm on-site substation. The second section of UGC is on final approach to the connection point at Blackhillock substation in the east (1080m in length) - both permitted development.
Council
Moray
Application Type
Section 37 SE Energy Consent Unit
Date Received
27 Mar 2023
Date Validated
03 Apr 2023
Decision Date
16 Aug 2023
Council Website
View on Moray websiteLocation
Address
Elchies (RothesIII) Wind Farm
Quick Info
- UID
- 23/00519/S37
- Reference
- 23/00519/S37
- Status
- Granted
- Last Updated
- 09 Sep 2023