CON/24/04982
Application Details
Description
Details required by Condition 27 (Remediation Scheme - a) For Phase 1 and for Phase 2A (Block 4): (i) within three months of the date of this decision, a Gap Analysis Report detailing any necessary further intrusive site investigation, risk assessment, remediation and verification actions and identifying verification information requirements and timescales for completing those actions, shall be submitted for the written approval of the Local Planning Authority.?Should the details be refused then within one month of receiving a written refusal from the Local Planning Authority, subsequent details shall be submitted for the written approval of the Local Planning Authority, and (ii) shall continue to apply until such time that details are approved in writing by the Local Planning Authority. The approved Gap Analysis Report shall be fully implemented within the identified timescales) of planning permission PP/22/07718 (Variation of Condition 8 (tree protection scheme to retain two additional trees in Phase 2), Condition 28 (Land contamination Verification Report submission triggers); Condition 39 (Phasing Strategy of demolition and construction of Phases 2 and 3), Condition 41 (energy system to provide Combined Heat and Power plant and boiler in Phase 1 and Phase 2A Block 4 and Air Source Heat Pump system in Phase 2B Block 6), Condition 65 (energy system to provide Air Source Heat Pump system in Phase 2B Block 6), Condition 74 (scheme drawings to show parameter heights of Phase 2B Block 6), and Condition 75 (to refer to Wheelchair User Dwellings) of planning permission PP/13/04516 granted 31 January 2014 for Variation of Conditions 2, 7, 39, 48 and 62 (to allow amendments involving the re-phasing of remaining development, amendments to the parameter plans for block 6, amendments to wheelchair unit provision in Phase 1 and amendments to Tree Retention and Removal Plan to remove 2 trees) of planning permission granted 31st March 2010 (PP/09/02786) for the demolition of existing buildings and temporary partial loss of existing open space (Athlone Gardens) to facilitate redevelopment to provide new residential accommodation of up to 1,000 units, up to a maximum of 3,104 square metres (GEA) of non residential floorspace (within Classes A1, A2, A3, A5 and/or Class B1 Use Classes), reprovision of community facilities and associated outdoor adventure playspace (total 1,883 square metres) (within Use Classes D1 and D2), relocation and reprovision of an area of open space (Athlone Gardens) (9,186 square metres), reprovision of 20 lock ups (within Use Class B8), provision of a temporary energy centre in Phase 1 to be replaced by a permanent energy centre, provision of landscaping, provision of a new internal road network based on a traditional internal street pattern, access junctions and associated roads including the reconnection of the junction with the external road network at Ladbroke Grove and Portobello Road and Wornington Road at Barlby Road, up to 604 car parking spaces (on street and off street) together with 4 car club spaces in Phase 1, up to 6 car club spaces in subsequent phases and 1177 cycle parking spaces, with details submitted for Phase One and all other matters reserved [MAJOR APPLICATION])
Council
Kensington
Application Type
Discharge of Conditions
Date Received
18 Jul 2024
Date Validated
02 Aug 2024
Council Website
View on Kensington websiteLocation
Address
Wornington Green Estate - Land bounded by the main railway, Wornington Road, Munro Mews, Portobello Road and including land fronting Ladbroke Grove near the Barlby Road junction, London, W10
Quick Info
- UID
- CON/24/04982
- Reference
- CON/24/04982
- Status
- Unknown
- Last Updated
- 09 Nov 2025