Hampshire - 2025

26 planning applications validated in 2025

26

Total

20

Granted

1

Refused

All Applications
Reference Address Description Status Date Validated
25/01603/HCM Silverlake Automotive Recycling Ltd, Row Ash, Botley Road, Southampton Shedfield … Retrospective application for the erection of 2no. Site Buildings Granted 28 Jul 2025
P/25/1005/CC Down End Quarry, Down End Road, Fareham, Hampshire PO16 8TR Proposed variation of Conditions 5 (Types of Waste) and 22 (Plans) of Planning Permission No: … Granted 25 Jul 2025
- Land adjacent to Basingstoke Road A339 and west of Whitedown … Road widening and new access affecting ditch Unknown 22 Jul 2025
P/25/0931/CC Lower Brownwich Farm, Brownwich Lane, Fareham Hampshire PO14 4NS The replacement of decayed oak knee braces between posts and beams along the North East … Granted 09 Jul 2025
25/01389/HCS College House, Shepherds Lane, Compton, Hampshire SO21 2AB Refurbishment of The Hive modular building to provide a 24 place Foundation Stage unit for … Granted 07 Jul 2025
25/00374/HCC Talavera Infants School, Gun Hill, Aldershot Hampshire GU11 1RG Extension to car park at Talavera Junior School. Including hard standing and associated soft landscaping Granted 07 Jul 2025
25/10690 Poulner Infant School, North Poulner Road Ringwood, Hampshire BH24 3LA Removal of Condition 5 (Electronic Vehicle (EV) charging point) of Planning Permission 21/11426 Granted 07 Jul 2025
25/10604 Newbourne Farm, Waste Processing Site, Road Through Rockbourne, Rockbourne Hampshire … Variation of conditions 3 (Waste Types), 5 (Vehicle Movements), 7 (Tonnage) of Planning Permission 18/10241 Unknown 23 Jun 2025
CS/25/99539 East Horton Golf Centre, Mortimers Lane, Fair Oak Hampshire SO50 … ‘‘Hybrid” planning application comprising: Full planning permission comprising - Closure of 14th, 15th and 18th … Granted 10 Jun 2025
25/01229/HCS East Horton Golf Centre, Mortimers Lane, Fair Oak Hampshire SO50 … ‘‘Hybrid” planning application comprising: Full planning permission comprising - Closure of 14th, 15th and 18th … Granted 10 Jun 2025
P/25/0872/CC Brookfield Community School, Brook Lane, Sarisbury Green, Southampton, SO31 7DU The proposed development is the relocation of existing cycle stands, separated from one location to … Granted 10 Jun 2025
25/01404/CC3 Maple Ridge School, Maple Crescent, Basingstoke Hampshire RG21 5SX Increase car park provision and improve vehicle and pedestrian access for the existing school Granted 05 Jun 2025
25/01225/CMAS Nursling Recycling Facility, Lee Lane, Nursling Southampton SO16 0AD Application to Vary Condition 4 (Hours of Working) of Planning Permission 22/00174/CMAS Refused 29 May 2025
25/10427 Marchwood Quarry, Bury Road, Marchwood Hampshire SO40 4UD (EIA) Variation of condition 1 of Planning Permission 12/99110 to extend the time period of completion … Granted 24 Apr 2025
25/00883/CMA Tank 56m From Thames Water Plc, Whitmarsh Lane 43m From … Variation of Condition 2 (increase in sewage sludge treated) of planning permission 16/03777/CMA Granted 31 Mar 2025
CS/25/99202 Manor Farm Country Park, Pylands Lane, Bursledon Hampshire SO31 1BH The construction of a single storey wooden shelter to provide protection for Manor Farm visitors … Granted 26 Mar 2025
CS/25/99159 Netley Chapel, Royal Victoria Country Park, Netley Abbey Hampshire SO31 … Interventions to improve the structural integrity of the chapel tower, conservation of masonry and replacement … Granted 24 Mar 2025
CS/25/99201 Stoneham Park Academy, Whieldon Way, North Stoneham Park, Eastleigh, Hampshire … Variation of condition 7 of planning permission CS/18/84183 for a New 32.9 x 18.5m MUGA … Granted 21 Mar 2025
- The Castle, Castle Avenue, Winchester, Hampshire SO23 8UJ (LB) Replacement of door closer mechanism and addition of door sensors to external door Withdrawn 04 Mar 2025
CS/25/99067 Netley Chapel, Royal Victoria Country Park, Netley Abbey Hampshire SO31 … Interventions to improve the structural integrity of the chapel tower, conservation of masonry and replacement … Granted 03 Mar 2025
25/00423/HCM Serles House, Southgate Street, Winchester Hampshire SO23 9EG The installation of a secondary handrail at regulation height inside the existing main stair well … Granted 19 Feb 2025
- A303 Enviropark IBA Recycling Facility Proposal to replace and extend the existing IBA Processing Plant Not required 18 Feb 2025
APP/25/00026 Warblington School, Southleigh Road, Havant Hampshire PO9 2RR Recladding of Block 024X Granted 10 Jan 2025
25/10046 Plot G1/G2, Oceanic Way, Marchwood Industrial Park, Southampton, Marchwood SO40 … Waste Transfer Station Unknown 08 Jan 2025
25/00124/HCM Land at Woodhouse Lane and to the North and East … Variation of Conditions 3 (CEMP), 4 (DMP), 6 (CTMP), 8 (CLDS & MMP), 10 (EA … Granted 07 Jan 2025
CS/25/98843 Land at Woodhouse Lane and to the North and East … Variation of Conditions 3 (CEMP), 4 (DMP), 6 (CTMP), 8 (CLDS & MMP), 10 (EA … Granted 07 Jan 2025