FUL/000246/23
Application Details
Description
Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon dioxide and the demolition/removal of redundant structures at the terminal; construction and use of new infrastructure required for carbon dioxide service at the Point of Ayr gas terminal; retention and use of the existing 20 inch diameter gas pipeline, condensate pipes and associated cables from the Point of Ayr gas terminal to the Mean Low Water Spring mark for the transport of carbon dioxide and associated activities; removal of the Shut Down Valve compound associated with the existing 20 inch diameter gas pipeline from the Point of Ayr gas terminal to the Mean Low Water Spring mark and appropriate restoration/remediation; construction and use of two 33kV electricity and fibre optic connections from Point of Ayr gas terminal to the Mean Low Water Spring mark; and construction and use of two kiosks and associated fenced compounds located on the line of the proposed 33kV electricity and fibre optic connections.
Council
Flintshire
Application Type
Full - Building Works
Date Received
10 Mar 2023
Date Validated
14 Mar 2023
Decision Date
23 May 2024
Council Website
View on Flintshire websiteLocation
Address
Point of Ayr Colliery, Ffynnongroyw, Holywell
Postcode
CH5 3FF
UPRN
Coordinates
53.189239000000000, -3.048926300000000
Source: Application UPRN
Quick Info
- UID
- FUL/000246/23
- Reference
- FUL/000246/23
- Status
- Granted
- Last Updated
- 24 May 2024