FUL/000246/23

Status: Granted (23 May 2024)
Application Details
Description

Retention and use of existing structures, plant and ancillary development (including access roadway and landscaping) forming the Point of Ayr gas terminal for the transport of carbon dioxide and the demolition/removal of redundant structures at the terminal; construction and use of new infrastructure required for carbon dioxide service at the Point of Ayr gas terminal; retention and use of the existing 20 inch diameter gas pipeline, condensate pipes and associated cables from the Point of Ayr gas terminal to the Mean Low Water Spring mark for the transport of carbon dioxide and associated activities; removal of the Shut Down Valve compound associated with the existing 20 inch diameter gas pipeline from the Point of Ayr gas terminal to the Mean Low Water Spring mark and appropriate restoration/remediation; construction and use of two 33kV electricity and fibre optic connections from Point of Ayr gas terminal to the Mean Low Water Spring mark; and construction and use of two kiosks and associated fenced compounds located on the line of the proposed 33kV electricity and fibre optic connections.

Council

Flintshire

Application Type

Full - Building Works

Date Received

10 Mar 2023

Date Validated

14 Mar 2023

Decision Date

23 May 2024

Location
Address

Point of Ayr Colliery, Ffynnongroyw, Holywell

Postcode

CH5 3FF

Coordinates

53.189239000000000, -3.048926300000000

Source: Application UPRN

Quick Info
UID
FUL/000246/23
Reference
FUL/000246/23
Status
Granted
Last Updated
24 May 2024