ESS/39/23/BTE/SO
Application Details
Description
Continuation of development of the Integrated Waste Management Facility (IWMF) with deletion of condition 66, approved details thereunder and associated conditions (Plan of Action if development not taken forward within 5 years) of planning permission ESS/34/15/BTE. ESS/34/15/BTE was amended planning permission for “The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.”
Council
Essex
Application Type
Screening Opinion Request CC/ESS
Date Received
18 May 2023
Date Validated
18 May 2023
Council Website
View on Essex websiteLocation
Address
Land at Rivenhall Airfield Coggeshall Road, Braintree, CO5 9DF
Postcode
CO5 9DF
Coordinates
51.850140000000000, 0.654942000000000
Source: Postcode Field
Quick Info
- UID
- ESS/39/23/BTE/SO
- Reference
- ESS/39/23/BTE/SO
- Status
- Not required
- Last Updated
- 20 May 2023