D25A/0788/WEB

Status: Granted (17 Apr 2026)
Application Details
Description

1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq. m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m. GFA) consisting of 122 no. suites (73 no. one bedroom and 49 no. two bedroom) with reception area, administration and back of house facilities, ancillary public areas service, plant areas, waste management areas and storage areas at ground floor, provision of 16 no. surface car parking spaces (including 2 no. disabled spaces) and 54 no. cycle parking spaces; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building, ESB substation and switchroom, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath.

Council

Dunlaoghaire

Application Type

Permission

Date Received

17 Oct 2025

Date Validated

23 Mar 2026

Decision Date

17 Apr 2026

Location
Address

Grafton House, Ballymoss Road, Sandyford Bus Pk, Dublin 18, D18P274

Postcode

D18P274

Quick Info
UID
103855
Reference
D25A/0788/WEB
Status
Granted
Last Updated
23 Apr 2026