D25A/0382/WEB

Status: Granted (27 Aug 2025)
Application Details
Description

The development consists of refurbishment works which consist of: 1. General refurbishment works. 2. New rooflight in rear slope of pitched roof and associated internal works. 3. Works to improve energy efficiency, which comprise: insulation of roof space (cold roof) with additional roof vents provided; replacement of existing lower ground floor with new insulated solid floor build up to include radon barrier; renewal of lower ground floor wall finishes; replacement of existing float glass with slim vacuum type energy efficient double glazing; localised insulation around window openings; installation of renewable energy services - air source heat pump and roof mounted PV/Solar panels (on rear, south-facing pitch). 4. Installation of a cavity type waterproofing system at lower ground floor level to address the high water table with vapour permeable lime based plaster finish to walls. 5. Alteration of 1No existing window opening on rear facade to form external door opening. 6. Alteration of 1970s/80s sub-divided lower ground floor room to provide family bathroom and corridor to side garage/storage. 7. General internal refurbishment and decoration works including relocation of kitchen from lower ground floor to upper ground floor. 8. Repairs and refurbishment to window and external door joinery, including replacement of modern external doors. 9. Installation of new electrical, heating and plumbing services. 10. Repairs and re-rendering chimney stacks and chimney pots. 11. Provision of EV charging point at front garden.

Council

Dunlaoghaire

Application Type

Permission

Date Received

13 May 2025

Date Validated

31 Jul 2025

Decision Date

27 Aug 2025

Location
Address

2, Brighton Vale, Monkstown, Co. Dublin, A94DK07 (a Protected Structure)

Postcode

A94DK07

Quick Info
UID
102399
Reference
D25A/0382/WEB
Status
Granted
Last Updated
31 Aug 2025