D24A/0700/WEB

Status: Refused (12 Sep 2024)
Application Details
Description

The development at Carrig Baun (Protected Structure) will consist of: (i) refurbishment of the elevations and repair of external renders, including the renovation of bay windows (ii) repair and refurbishment of the existing roof with installation of PV panels and insulation at the attic level; (iii) remodeling of the internal layout at the Ground and First Floor levels including refurbishment and renovation of floors, ceilings, stairs, balustrades, internal plasterwork throughout the property and installation of underfloor heating; (iv) repair and renovation of existing joinery, including doors and windows; (v) modification in the depth of the rear balcony, the introduction of skylights, and replacement of the balcony balustrade; (vi) landscaping, site works, drainage works, and all associated ancillary works necessary to facilitate the development.

Council

Dunlaoghaire

Application Type

Permission

Date Received

07 Sep 2024

Date Validated

07 Sep 2024

Decision Date

12 Sep 2024

Location
Address

Carrig Baun, Rockfort Avenue, Dalkey, Co.Dublin, A96YW35

Postcode

A96YW35

Quick Info
UID
100088
Reference
D24A/0700/WEB
Status
Refused
Last Updated
21 May 2025