LRD23A/0052
Application Details
Description
Alterations to the Strategic Housing Development permitted under ABP Ref 301522-18, as amended under ABP Refs 304212-19, 305172-19, 308563-20 and 310422-21, which is currently under construction on a site, Clay Farm Phase 2, Ballyogan Road, Dublin 18. The application site is located to the south of Clay Farm Phase 1, to the north-west of Stepaside Golf Course, to the north and north-east of Cruagh Wood and Stepaside Park and to the east of two dwellings, including Clay Farm House. The proposed alterations, which relate to the West Village area of the permitted development consist of the following: Provision of an additional substation and switchroom, with a gross floor area of c. 38 sqm, associated maintenance access road and set down area. Replacement of 8 no 3-bed two storey terraced houses, with 7 no. 3-bed two storey semi-detached houses and 1 no. 3 bed two storey detached house. All associated car parking changes, landscaping and site development works. Website: www.cfphase2shdamdts.ie
Council
Dunlaoghaire
Application Type
Permission (LRD)
Date Validated
31 Jan 2023
Decision Date
13 Feb 2023
Council Website
View on Dunlaoghaire websiteLocation
Address
Site at Clay Farm (Phase 2), Ballyogan Road, Dublin 18
Quick Info
- UID
- 95246
- Reference
- LRD23A/0052
- Status
- Refused
- Last Updated
- 22 May 2025