D22A/1029

Status: Granted (18 Apr 2023)
Application Details
Description

5 year temporary permission for 1: installation of single storey lightweight aluminium frame building (total area 800sqm) for use as an electric vehicle preparation centre. To include dry valeting, Electric vehicle charging, handover bays, ancillary office and staff facilities. 2 Non illuminated building signage. 3 Installation of a seperate single storey lightweight aluminium frame building (total area 105sqm) for use as a wet valeting facility. 4 Rainwaterharvesting tanks (total capacity 36000 litres) and below ground silt and petrol interceptor and attenuation 5. 12 no. electric vehicle exterior charging points. 6 all associated site works.

Council

Dunlaoghaire

Application Type

Permission

Date Validated

24 Mar 2023

Decision Date

18 Apr 2023

Location
Address

37 Heather Road, Sandyford Business Park, Dublin 18, D18 R9T3

Postcode

D18 R9T3

Quick Info
UID
95050
Reference
D22A/1029
Status
Granted
Last Updated
21 May 2025