3194/25Sub02
Application Details
Description
Drainage The management of surface water and other drainage provisions for the development shall fully comply with the requirements of the Drainage Division: (iii) A connection from this development to the public Surface Water sewer network will only be granted when the developer has obtained the written permission of the DPPDC Section. All expense associated with carrying out the connection work are the responsibility of the developer. Developers are not permitted to connect to the public Surface Water network system without written permission from the DPPDC Section. Any unauthorised connections shall be removed by the DPPDC Section at the developer’s expense. A licence will be required from the DPPDC Section to allow the connection work to be carried out. Permission of the Roads Dept must also be obtained for any work in the public roadway. (iv) The development shall incorporate Sustainable Drainage Systems in the management of surface water. Full details of the surface water management proposal shall be agreed in writing with the planning authority prior to the commencement of the development. (viii) Where pipelines are to be taken-in-charge by Dublin City Council, as-constructed drawings of all pipelines complete with CCTV surveys, to a standard specified by the Drainage Division, must be submitted to the planning authority for written sign-off. This must be submitted no later than the completion of each phase of the development works on site. Please refer to Section 5 of the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.
Council
Dublin New
Date Validated
22 Jun 2026
Decision Date
28 Jul 2026
Council Website
View on Dublin New websiteLocation
Address
Bluebell Waterways, Bluebell Avenue and Bluebell Road, Bluebell, Dublin 12
Quick Info
- UID
- 176326
- Reference
- 3194/25Sub02
- Status
- Unknown
- Last Updated
- 04 Oct 2026