WEB2459/26

Status: Granted (07 Aug 2026)
Application Details
Description

(i) the demolition of an existing steel fire escape staircase attached to the exterior of the building at the northern gable end; (ii) the construction of a new external steel fire escape staircase attached to the northern side of the existing building which will serve the three upper stories, ie first second and third floors, as well as the roof of the existing building. The new stairs is to be roofed but not fully enclosed on the sides; (iii) the widening of three no. existing external door opes opening onto the stairs, one at each of first floor, second floor and third floor levels; (iv) the replacement of an existing full height metal access gate with protective cage at roof level with a new mesh metal access gate in the same location, height to match the existing railing; and (v) all associated siteworks, services and landscaping to facilitate the proposed development.

Council

Dublin New

Application Type

Permission

Date Received

22 May 2026

Date Validated

12 Jun 2026

Decision Date

07 Aug 2026

Location
Address

Bunscoil Sancta Maria, Synge Street, Dublin 8

Quick Info
UID
176184
Reference
WEB2459/26
Status
Granted
Last Updated
18 Aug 2026