WEB2459/26
Application Details
Description
(i) the demolition of an existing steel fire escape staircase attached to the exterior of the building at the northern gable end; (ii) the construction of a new external steel fire escape staircase attached to the northern side of the existing building which will serve the three upper stories, ie first second and third floors, as well as the roof of the existing building. The new stairs is to be roofed but not fully enclosed on the sides; (iii) the widening of three no. existing external door opes opening onto the stairs, one at each of first floor, second floor and third floor levels; (iv) the replacement of an existing full height metal access gate with protective cage at roof level with a new mesh metal access gate in the same location, height to match the existing railing; and (v) all associated siteworks, services and landscaping to facilitate the proposed development.
Council
Dublin New
Application Type
Permission
Date Received
22 May 2026
Date Validated
12 Jun 2026
Decision Date
07 Aug 2026
Council Website
View on Dublin New websiteLocation
Address
Bunscoil Sancta Maria, Synge Street, Dublin 8
Quick Info
- UID
- 176184
- Reference
- WEB2459/26
- Status
- Granted
- Last Updated
- 18 Aug 2026