WEB1908/25Sub01

Status: Pending
Application Details
Description

2. The following requirements of the Engineering Department (Drainage Division) shall be complied with: a) The developer shall comply with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0 (available from www.dublincity.ie Forms and Downloads). b) As no surface water management details have been submitted, the developer shall submit a surface water management plan, including drawings, to the planning authority for written approval. The development shall incorporate Sustainable Drainage Systems in the management of surface water. Full details of the surface water management proposals and plans shall be submitted prior to the commencement of development, and drainage works shall not commence prior to the issuing of such written approval c) The development is to be drained on a completely separate foul and surface water system d) All private drainage such as, downpipes, gullies, manholes, armstrong junctions, etc. are to be located within the final site boundary. Reason: To ensure the protection of public drainage infrastructure, and the satisfactory management of surface water runoff and flood risk as a result of the development.

Council

Dublin New

Date Validated

04 Feb 2026

Location
Address

14 Fairview Green, Dublin 3, D03 T8K3

Quick Info
UID
173906
Reference
WEB1908/25Sub01
Status
Pending
Last Updated
04 Jun 2026