WEB2416/25Sub01
Application Details
Description
4. The applicant shall comply with the following drainage requirements of the Planning Authority: I. The developer shall comply with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0 (available from www.dublincity.ie Forms and Downloads). II. The development is to be drained on a completely separate foul and surface water system. III. The design and construction of soakaways must comply with the requirements of BRE Digest 365 and CIRIA C753. Full details of these shall be agreed in writing with the Planning Authority prior to commencement of construction. IV. The development shall incorporate Sustainable Drainage Systems in the management of surface water. Full details of the surface water management proposals shall be agreed in writing with the planning authority prior to the commencement of the development V. All private drainage such as, downpipes, gullies, manholes, armstrong junctions, etc. are to be located within the final site boundary. VI. Proposed paved areas shall incorporate Sustainable Drainage Systems in the management of surface water so that there is no increase in surface water run-off from the development to the drainage network as per the Dublin City Development Plan 2022-2028. Reason: To ensure the protection of public drainage infrastructure, and the satisfactory management of surface water runoff and flood risk as a result of the development.
Council
Dublin New
Date Validated
30 Jan 2026
Decision Date
19 Mar 2026
Council Website
View on Dublin New websiteLocation
Address
88 Brookwood Avenue, Artane, Dublin 5
Quick Info
- UID
- 173870
- Reference
- WEB2416/25Sub01
- Status
- Unknown
- Last Updated
- 25 May 2026