2654/20Sub10
Application Details
Description
7. The construction of the development shall be managed in accordance with a Construction Management Plan, the content of which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of intended construction practice for the development, including: (a) Location of the site and materials compound(s) including area(s) identified for the storage of construction refuse; (b) Location of areas for construction site offices and staff facilities; (c) Details of site security fencing and hoardings; (d) Details of on-site car parking facilities for site workers during the course of construction; (e) Details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site; (f) Measures to obviate queuing of construction traffic on the adjoining road network; (g) Measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network; (h) Alternative arrangements to be put in place for pedestrians and vehicles in the case of the closure of any public road or footpath during the course of site development works; (i) Details of appropriate mitigation measures for noise, dust, vibration and structural stability of adjoining property and monitoring of same. Noise mitigation measures shall include- (i) Identification and agreement of noise sensitive locations including schools, (ii) advanced notice of significant noise generating activities to noise sensitive locations, (iii) timing of significant noise generating activities outside of school hours where possible, and (iv) details of a dedicated noise liaison person who shall be responsible for all necessary consultations with identified noise sensitive locations. (j) Containment of all construction-related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater; (k) Off-site disposal of construction/demolition waste and details of how it is proposed to manage excavated soil; (I) Means to ensure that surface water run-off is controlled such that no silt or other pollutants enter local surface water sewers or drains. A record of daily checks that the works are being undertaken in accordance with the Construction Management Plan shall be kept for inspection by the planning authority. Reason: In the interest of amenities, public health and safety.
Council
Dublin New
Date Validated
19 Jan 2026
Decision Date
06 Mar 2026
Council Website
View on Dublin New websiteLocation
Address
25-26, Blackpitts, Dublin 8
Coordinates
53.335126137499593, -6.275935745721370
Source: Lat and Lng
Quick Info
- UID
- 173668
- Reference
- 2654/20Sub10
- Status
- Unknown
- Last Updated
- 04 Jun 2026