3275/24Sub05
Application Details
Description
4. The following requirements of the Drainage Division shall be strictly adhered to: a) There is an existing public surface water sewer running through the site. The exact location of this pipeline shall be accurately determined onsite prior to construction work commencing. No additional loading shall be placed on this sewer. b) The developer shall carry out both a pre- and post-construction CCTV survey on the public surface water sewer crossing the site. The pre-construction survey shall be submitted to the Drainage Division prior to commencement of the development. The post-construction survey shall be submitted for written approval no later than on completion of the development. Any damage to the sewer shall be rectified at the developer's expense. Reason: To ensure the protection of public drainage infrastructure, and the satisfactory management of surface water runoff and flood risk as a result of the development.
Council
Dublin New
Date Validated
13 Jan 2026
Decision Date
09 Feb 2026
Council Website
View on Dublin New websiteLocation
Address
at Chapelizod Road (R109), Chapelizod, Dublin 8, and Irish National War Memorial Gardens (INWMG)
Coordinates
53.346030488598217, -6.317782476900870
Source: Lat and Lng
Quick Info
- UID
- 173567
- Reference
- 3275/24Sub05
- Status
- Unknown
- Last Updated
- 01 Jun 2026