SHD0031/20Sub09
Application Details
Description
19. The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of intended construction practice for the development, including: (b) Location of the site and materials compound(s) including area(s) identified for the storage of construction refuse, (c) Location of areas for construction site offices and staff facilities, (d) Details of site security fencing and hoardings. Hoardings shall include a one square metre area on each road frontage detailing site management contact details, (e) Details of onsite car parking facilities for site workers during the course of construction, (f) Details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site, (g) Measures to obviate queuing of construction traffic on the adjoining road network, (h) Measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network, (j) Details of appropriate mitigation measures for noise, dust and vibration, and monitoring of such levels, (k) Containment of all construction related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater, (l) Off-site disposal of construction and demolition waste and details of how it is proposed to manage excavated soil, (n) Means to ensure that surface water runoff is controlled such that no silt or other pollutants enter local surface water sewers or drains, (o) A record of daily checks that the works are being undertaken in accordance with the Construction Management Plan shall be kept for inspection by the planning authority, (p) A community liaison officer shall be appointed for the duration of the construction works.
Council
Dublin New
Date Validated
29 Jan 2026
Decision Date
09 Mar 2026
Council Website
View on Dublin New websiteLocation
Address
Former Player Wills site and Undeveloped Land in Ownership of D.C. C., S. C. R, Dublin 8 (ABP 308917- 20)
Coordinates
53.332108390488514, -6.291039102179836
Source: Lat and Lng
Quick Info
- UID
- 172426
- Reference
- SHD0031/20Sub09
- Status
- Unknown
- Last Updated
- 26 May 2026