WEB2866/25

Status: Granted (01 Apr 2026)
Application Details
Description

PERMISSION/RETENTION : 1) Permission for construction of a new extension to the south of existing production facility, to include a high-care production area, first-floor office accommodation, a storage and picking area, and plant room together with a new yard for truck and van deliveries. 2) Permission for construction of a new refrigeration plant room to the west of the new extension. 3) Permission to extend the existing car park to the east of the site by 20 spaces. 4) Retention Permission of existing temporary modular production rooms, located to the south of the existing facility, and associated site works. These temporary structures will be removed upon completion of the proposed extension. 5) Retention Permission of approximately 122 linear metres of razor wire, installed over existing mesh fencing along the eastern boundary of the site, commencing at the north-eastern corner. 6) Permission for the installation of razor wire over the existing smoking shelter located adjacent to the site entrance. 7) Retention Permission of an increased height-approximately 2.1m to 3.3m-of 35 metres of palisade fencing connecting to the mesh fence at the south-eastern corner of the site. 8) Permission to increase the height of the remaining palisade fencing from 2.1m to 3.3m along the remaining southern boundary of the site extending to the south-west corner. 9) All associated site development works and services.

Council

Dublin New

Application Type

Permission

Date Received

11 Aug 2025

Date Validated

05 Mar 2026

Decision Date

01 Apr 2026

Location
Address

IDA Industrial Park, Poppintree, Finglas, Dublin 11, D11 F851

Quick Info
UID
171155
Reference
WEB2866/25
Status
Granted
Last Updated
11 Apr 2026