4521/23Sub01
Application Details
Description
2. Conservation The applicant shall submit the following architectural conservation details/revisions for the written approval of the Planning Authority prior to the commencement of development: (a) Revised drawings for the reinstatement of the lath-and-plaster ceiling to the Technical Services Room, and a methodology for the repair of the surviving lath-and-plaster ceilings to the Chief Mechanical Engineer’s office; or alternative arrangements subject to agreement with the DCC Conservation section. (b) A conservation expert with proven and appropriate expertise shall be employed to design, manage, monitor and implement the works and to ensure adequate protection of the retained and historic fabric during the works. In this regard, all permitted works shall be designed to cause minimum interference to the retained fabric and the curtilage of the Protected Structure. (c) The proposed development shall be carried out in accordance with the following: (i) All works to the structure shall be carried out in accordance with best conservation practice and the Architectural Heritage Protection Guidelines for Planning Authorities (2011) and Advice Series issued by the Department of Housing, Local Government and Heritage. Any repair works shall retain the maximum amount of surviving historic fabric in situ. Items to be removed for repair off-site shall be recorded prior to removal, catalogued and numbered to allow for authentic re-instatement. (ii) All existing original features, in the vicinity of the works shall be protected during the course of the refurbishment works. (iii) All repair of original fabric shall be scheduled and carried out by appropriately experienced conservators of historic fabric. (iv) The architectural detailing and materials in the new work shall be executed to the highest standards so as to complement the setting of the protected structure and the historic area.
Council
Dublin New
Date Validated
30 Jul 2025
Decision Date
08 Sep 2025
Council Website
View on Dublin New websiteLocation
Address
Chief Mechanical Engineers Building, Inchicore Railway Works, Inchicore, Dublin 8, D08 K6Y3
Coordinates
53.339818343978692, -6.330383742223539
Source: Lat and Lng
Quick Info
- UID
- 170983
- Reference
- 4521/23Sub01
- Status
- Unknown
- Last Updated
- 14 Nov 2025