3345/24Sub04
Application Details
Description
2. Prior to commencement of development, the developer shall submit to the planning authority for written agreement a detailed method statement covering all works proposed to be carried out, including: (a) a full specification, including details of materials and methods, to ensure the development is carried out in accordance with current Conservation Guidelines issued by the Department of Arts, Heritage and the Gaeltacht, (b) a methodology for the recording and/or retention of concealed features or fabric exposed during the works, and (c) details of features to be temporarily removed/relocated during construction works and their final re-instatement. Details shall be accompanied by drawings of an appropriate scale in respect of the following architectural conservation details: (i) Confirmation of the extent of structural works required at third-floor level to support the new structure. A methodology, cross-referenced to drawings, as required, for the structural interventions shall be provided. (ii) 1:20 drawings of the proposed glazing to the south elevation of the extension. The proposed glazing bars shall be as slender as possible. (iii) 1:20 drawing of the proposed stairs from the third floor to the extension. The proposed new stairs shall be complimentary to the historic stairs.
Council
Dublin New
Date Validated
11 Apr 2025
Decision Date
28 May 2025
Council Website
View on Dublin New websiteLocation
Address
No. 38 Fenian Street, Dublin 2
Coordinates
53.341742161076233, -6.250158188110095
Source: Lat and Lng
Quick Info
- UID
- 166798
- Reference
- 3345/24Sub04
- Status
- Unknown
- Last Updated
- 09 Nov 2025