2409/20Sub05
Application Details
Description
3. The construction of the development shall be managed in accordance with a Demolition and Construction Management Plan, which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of intended construction practice for the development, including: (i) Location of the site and materials compound. (ii) Location of areas for construction site offices and staff facilities. (iii) Details of site security fencing and hoardings. (iv) Details of timing and routing of construction traffic to and from the construction site and associated directional signage. (v) Measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network. (vi) details of appropriate mitigation measures for noise, dust and vibration, and monitoring of such levels. (vii) containment of all construction-related fuel and oil. (viii) arrangements for storage and removal of construction and demolition waste and measures for management of surface water run-off. (ix) arrangements to ensure that during the construction and demolition phases works are in accordance the standards, as set out in British Standard 5228 ‘Noise Control on Construction and Open Sites, Part 1. Code of practice for basic information and procedures for noise control.’ (x) a monitoring system and record of daily checks that the works are being undertaken in accordance with the Construction Management Plan which shall be kept for inspection by the planning authority.
Council
Dublin New
Date Validated
09 Apr 2025
Decision Date
03 Jun 2025
Council Website
View on Dublin New websiteLocation
Address
Nos 1, 1a and 2 Usher Street, Dublin 8 & Nos. 29-30 Ushers Quay, Dublin 8 (D08 YY11 & D08 VYX7)
Coordinates
53.345448743007204, -6.279498675299755
Source: Lat and Lng
Quick Info
- UID
- 165748
- Reference
- 2409/20Sub05
- Status
- Unknown
- Last Updated
- 07 Nov 2025