WEB1580/23Sub01

Status: Pending
Application Details
Description

3. The structure shall be single storey and the mezzanine level shall be omitted. The developer shall submit revised section and elevation drawings showing the following within three months of the date of this order: (a) The highest point of the hipped roof (which shall be in the centre of the roof) shall be no more than 3.8 metres above the finished floor level. (b) The eaves height (or parapet height if one is provided) shall be no more than three metres above the finished floor level. (c) Upon receipt of the written agreement of the planning authority in relation to the revised drawings, the works required to the shed structure shall be concluded within six months.

Council

Dublin New

Date Validated

10 Feb 2025

Location
Address

97, Annamoe Drive, Cabra, Dublin 7 D07 W4A7

Coordinates

53.359100102185607, -6.283965931200435

Source: Lat and Lng

Quick Info
UID
165698
Reference
WEB1580/23Sub01
Status
Pending
Last Updated
16 Nov 2025