DSDZ3838/24Sub05

Status: Unknown (10 Sep 2025)
Application Details
Description

13. The developer shall comply with the following requirements of the Drainage Division of Dublin City Council b) There is an existing public surface water sewer running through the site. The exact location of this pipeline must be accurately determined on site prior to construction work commencing. No additional loading shall be placed on this sewer. The developer shall carry out both a pre- and post-construction CCTV survey on the public surface water sewers affected by this development, as agreed with DPPDC Section. The pre-construction survey is to be submitted to the DPPDC Section prior to commencement of the development. The post-construction survey is to be submitted to the DPPDC Section for written approval no later than on completion of the development. Any damage to the sewer shall be rectified at the developer's expense.

Council

Dublin New

Date Validated

07 Aug 2025

Decision Date

10 Sep 2025

Location
Address

No's 1-4 Martin's Terrace, Dublin 2 (D02DK03, D02TD56, D02XE14, D02YT10) and adjoining lands, at corner of Macken Street and the new realigned Hanover Street East

Coordinates

53.344127144935399, -6.241846784716521

Source: Lat and Lng

Quick Info
UID
165587
Reference
DSDZ3838/24Sub05
Status
Unknown
Last Updated
31 Dec 2025