3738/19/X1

Status: Granted (03 Mar 2025)
Application Details
Description

EXT. OF DURATION / PROTECTED STRUCTURE: (ref: 5109), in use as office space and headquarters to The Royal Institute of the Architects of Ireland, to comprise the following: reroofing, including chimneys, leadwork and timber repairs; repair of existing balcony; removal of existing cantilevered toilet block at 2nd floor landing and reconfiguration of opening to reinstate landing window; structural repairs; removal of existing conservatory at rear basement level and replacement with new structure to existing footprint; render repairs to rear elevations; refurbishment of timber sliding sash windows; fire upgrade of existing structure; conservation and repair of internal historic fabric; reinstatement of glazed lay light to first floor return; improved accessibility; reconfiguration of internal spaces to provide improved member, visitor and staff facilities; infill extension to rear return building; upgrade of M & E service installation; refurbishment of existing access platform at front basement level; external landscaping works at rear to provide universal access.

Council

Dublin New

Date Validated

09 Jan 2025

Decision Date

03 Mar 2025

Location
Address

The Architectural Centre, 8, Merrion Square North, Dublin 2

Quick Info
UID
165239
Reference
3738/19/X1
Status
Granted
Last Updated
05 Mar 2025