4333/18/X1

Status: Granted (11 Dec 2024)
Application Details
Description

EXT. OF. DURATION: PROTECTED STRUCTURE: The development consists of works to the area within and around the area of the Bus Eireann Headquarters building located towards the southerly end of the site and comprise the following: (1) a new railing to the easterly boundary wall, to replace the existing along with repairs & repointing to the retaining boundary wall below (2) works to the historic wrought iron railings and stone security hut to the easterly side of the building (3) a new external wheelchair accessible ramp to the side entrance with chair lift to internal stairs and works to adjacent doorways (4) repairs and alterations to the existing historic light stands along with repairs to the steps, plinth and paved areas around the front entrance (5) cleaning of the building facades (6) a new lighting scheme to the building exterior and (7) interior alterations to include a new accessible w.c., reception desk and repairs to the interior lobby - all at ground level along with repainting of hallways & atrium, removal of non-original walls in existing offices and replacement of the roof light above the atrium space. Broadstone Bus Depot is a protected structure.

Council

Dublin New

Date Validated

21 Oct 2024

Decision Date

11 Dec 2024

Location
Address

Broadstone Bus Depot, Constitution Hill, Dublin 7

Quick Info
UID
164088
Reference
4333/18/X1
Status
Granted
Last Updated
19 Dec 2024