4029/24

Status: Refused (10 Sep 2024)
Application Details
Description

The proposed development comprises site clearance works, including the demolition of all existing buildings /structures on site, including the existing boundary wall and gates along the Thomas Street frontage, and the construction of a new Part 3-; Part 4-; Part 6- and Part 7- storey Aparthotel building over basement level with a total Gross Floor Area (GIA) of 6,790 sq.m together with the formation of a new vehicular access ramp (with integrated bicycle lane) off Thomas Street leading to basement level. The basement level will accommodate 16 no. cycle parking spaces; staff changing-rooms/showers; a service yard and ancillary plant and storage rooms; waste/refuse storage; ancillary gym for hotel guests and ancillary kitchen. Ground floor level will accommodate a reception area (222.9 sq.m) and café (156.6 sq.m) accessed off Thomas Street, and an ESB sub-station and switchroom. Aparthotel rooms / suites are provided at first to fifth floor level (93 no. self-contained/self-catering units). At sixth floor level, a public bar / event space (257.5 sq.m) with south facing roof terrace is provided. Other site works include the provision of hard and soft landscaping measures to ancillary amenity spaces. The proposed building incorporates sustainable drainage measures that includes green roofs and underground attenuation tank. Screened plant is provided at rooftop level.

Council

Dublin New

Application Type

Permission

Date Validated

17 Jul 2024

Decision Date

10 Sep 2024

Location
Address

Site at Thomas Street, including No. 144 Thomas Street (the site is bounded by No. 143 Thomas Street, and Marshalsea Lane to the east and No's 151-156 Thomas Street to the west), Dublin 8

Coordinates

53.343505981418836, -6.283120590951026

Source: Lat and Lng

Quick Info
UID
162602
Reference
4029/24
Status
Refused
Last Updated
31 Mar 2025