WEB2127/22Sub01
Application Details
Description
7. The Developer shall comply with the following drainage requirements of the Planning Authority: • The developer shall comply with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0 (available from www.dublincity.ie Forms and Downloads). • All private drain fittings such as, downpipes, gullies, manholes, Armstrong Junctions, etc. Are to be located within the final site boundary. Private drains should not pass through property they do not serve. • The drainage for the proposed development shall be designed on a completely separate foul and surface water system with a combined final connection discharging into Irish Water’s combined sewer system. • The development shall incorporate Sustainable Drainage Systems in the management of surface water. Full details of these shall be agreed in writing with Drainage Division prior to commencement of construction. • Any new paving shall be carried out in a sustainable manner so that there is no increase in surface water run-off to the drainage network as per the Dublin City Development Plan 2022-2028.
Council
Dublin New
Date Validated
17 Jun 2024
Decision Date
23 Jul 2024
Council Website
View on Dublin New websiteLocation
Address
3, Island Villa, Dublin 2 D02 VX99
Coordinates
53.341065449306399, -6.242633385925878
Source: Lat and Lng
Quick Info
- UID
- 162051
- Reference
- WEB2127/22Sub01
- Status
- Decided and closed
- Last Updated
- 05 Mar 2025