3098/22Sub01

Status: Decided and closed (28 Aug 2024)
Application Details
Description

7. The developer shall comply with the following requirements of the Drainage Division of Dublin City Council: a) There is no objection to this development, subject to the developer complying with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0 (available from www.dublincity.ie Forms and Downloads). b) Records of public surface water sewers are indicative and must be verified on site. c) The drainage for the proposed development shall be designed on a completely separate foul and surface water system with surface water discharging to the public surface water sewer. d) A connection from this development to the public Surface Water sewer network will only be granted when the developer has obtained the written permission of the Drainage Division and fulfilled all the planning requirements including the payment of any financial levies. All expense associated with carrying out the connection work are the responsibility of the developer. Developers are not permitted to connect to the public Surface Water network system without written permission from the Drainage Division. Any unauthorised connections shall be removed by the Drainage Division at the developer’s expense. A licence will be required from the Drainage Division to allow the connection work to be carried out. Permission of the Roads Dept must also be obtained for any work in the public roadway. e) As no surface water management details have been submitted, the developer shall submit a surface water management plan, including drawings and a report, directly to the Drainage Division of Dublin City Council for written approval. These plans shall be submitted not later than the submission of the commencement notice for the development, and drainage works shall not commence prior to the issuing of such written approval. f) The development shall incorporate Sustainable Drainage Systems in the management of surface water. Full details of these shall be agreed in writing with Drainage Division prior to commencement of construction. g) There is an existing public surface water sewer running in close proximity to the proposed new dwelling. The exact location of this sewer shall be accurately determined onsite prior to construction work commencing. No additional loading shall be placed on this sewer. Any damage to the sewer shall be rectified at the developer's expense. Full details of measures to protect the integrity of the public sewer during and post construction shall be agreed in writing with DCC Drainage Division prior to commencement of works on site. h) The developer shall carry out both a pre- and post-construction CCTV survey on the public surface water sewer affected by this development, as agreed with Drainage Division. The pre-construction survey is to be submitted to the Drainage Division prior to works commencing on site. The post-construction survey is to be submitted to the Drainage Division for written approval and any damage to the sewer shall be rectified at the developer's expense. i) The developer shall ensure that an appropriate Flood Risk Assessment (FRA), in accordance with the OPW Guidelines and the Dublin City Development Plan 2016-2022 Strategic Flood Risk Assessment, is carried out for the proposed development. j) The outfall surface water manhole from this development must be constructed in accordance with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0. k) All private drainage such as, downpipes, gullies, manholes, armstrong junctions, etc. are to be located within the final site boundary. Private drains should not pass through property they do not serve.

Council

Dublin New

Date Validated

09 Jul 2024

Decision Date

28 Aug 2024

Location
Address

7, St. Mary's Road, Crumlin, Dublin 12, D12 R7W8

Coordinates

53.324026810168462, -6.318017682683246

Source: Lat and Lng

Quick Info
UID
161566
Reference
3098/22Sub01
Status
Decided and closed
Last Updated
05 Apr 2025