5457/22Sub01
Application Details
Description
9. The developer shall comply with the following requirements of the Drainage Division of Dublin City Council: a) The developer shall comply with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0 (available from www.dublincity.ie Forms and Downloads). b) The development is to be drained on a completely separate foul and surface water system with surface water discharging to the public surface water sewer. c) Records of public surface water sewers are indicative and must be verified on site. d) A connection from this development to the public Surface Water sewer network will only be granted when the developer has obtained the written permission of the Drainage Division and fulfilled all the planning requirements including the payment of any financial levies. All expense associated with carrying out the connection work are the responsibility of the developer. Developers are not permitted to connect to the public Surface Water network system without written permission from the Drainage Division. Any unauthorised connections shall be removed by the Drainage Division at the developer’s expense. A licence will be required from the Drainage Division to allow the connection work to be carried out. Permission of the Roads Dept must also be obtained for any work in the public roadway. e) Revised drainage layout shall be submitted for written approval by Drainage Division prior to commencement of works on site. Main point to note are: • All private drainage shall be located within the final site boundary • Flow control device shall limit the discharge of surface water from this development to 2 l/s up to and including 1% AEP critical rainfall event + 20% Climate Change. f) To minimise the risk of basement flooding, all internal basement drainage must be lifted, via pumping, to a maximum depth of 1.5 metres below ground level before being discharged by gravity from the site to the public sewer. g) Permanent discharge of groundwater to the drainage network is not permitted. h) Discharge of groundwater to the public drainage network may be permitted during construction subject to a trade effluent discharge license being obtained from Sanitary Authority as required by the Local Government (Water Pollution) Acts, 1977 and 1990 i) All surface water discharge from this development must be attenuated to two litres per second in accordance Greater Dublin Regional Code of Practice for Drainage Works Version 6.0. j) The development shall incorporate Sustainable Drainage Systems in the management of surface water, Full details of these shall be agreed in writing with Drainage Division prior to commencement of construction. k) The outfall surface water manhole from this development must be constructed in accordance with the Greater Dublin Regional Code of Practice for Drainage Works Version 6.0. l) All private drainage such as, downpipes, gullies, manholes, armstrong junctions, etc. are to be located within the final site boundary. Private drains should not pass through property they do not serve.
Council
Dublin New
Date Validated
27 May 2024
Decision Date
26 Jun 2024
Council Website
View on Dublin New websiteLocation
Address
Nos. 9, 10, Ardee Street corner St. Luke's Avenue, Dublin 8, D08KP9P
Postcode
D08KP9P
Coordinates
53.338384312269497, -6.279407677079588
Source: Lat and Lng
Quick Info
- UID
- 160604
- Reference
- 5457/22Sub01
- Status
- Decided and closed
- Last Updated
- 02 Feb 2025