2209/16Sub11
Application Details
Description
5. Prior to commencement of development, the developer shall submit to and agree in writing with the planning authority in consultation with Transport Infrastructure Ireland (TII) a revised construction methodology document which addresses the following: (a) Details on the extent of works and construction methodology for the works to the basement, basement roof slab and retaining wall adjoining the LUAS alignment. (b) Details of the extent and methodology of all excavations such as to enable assessment of whether these works are within the LUAS zone of influence. (c) Details of the method of construction of the eastern façade including the methodology for the craning of materials and the over sailing of the LUAS track during construction. Details for the proposed method of protection of the bespoke acoustic panelling bordering the LUAS alignment to the east of the site. (d) The submission of acceptable insurances and indemnities for the proposed works adjoining the LUAS alignment. Reason: To ensure a satisfactory standard of development and in the interest of safety.
Council
Dublin New
Date Validated
01 Jul 2024
Decision Date
19 Aug 2024
Council Website
View on Dublin New websiteLocation
Address
Hilton Dublin Hotel, Charlemont Place, Dublin 2
Coordinates
53.331371281755693, -6.259934812988391
Source: Lat and Lng
Quick Info
- UID
- 160314
- Reference
- 2209/16Sub11
- Status
- Decided and closed
- Last Updated
- 28 Mar 2025