2741/21Sub01

Status: Decided and closed (02 May 2024)
Application Details
Description

2. The Developer shall submit the following for written agreement with the Conservation Officer prior to commencement of development: a) A conservation expert with proven and appropriate expertise shall be employed to design, manage, monitor and implement the works to the building and to ensure adequate protection of the retained and historic fabric during the works. In this regard, all permitted works shall be designed to cause minimum interference to the retained building and facades structure and/or fabric. b) In advance of work commencing on site, the applicant shall submit the following to the Planning Authority for their agreement: - Revised fully detailed information, informed by good conservation practice, on how new work and how conservation repairs shall be carried out. Conservation specifications and methodologies for the making good to floors, walls, ceilings, fireplaces, chimneybreasts, roofs, windows, doors, joinery etc. shall be identified and submitted. - Detailed drawings that co-ordinate structural intervention, services installation and general upgrading and repair works shall be submitted. All new services routes shall be introduced with as little impact on the historic fabric as possible and shall have no impact on the special architectural character of the Protected Structure. c) All works to the protected structure shall be carried out in accordance with best conservation practice and the Architectural Heritage Protection Guidelines for Planning Authorities (2011) and Advice Series issued by the Department of the Environment, Heritage and Local Government. Any repair works shall retain the maximum amount of surviving historic fabric in situ. Items to be removed for repair off-site shall be recorded prior to removal, catalogued and numbered to allow for authentic re-instatement. d) All existing original features, in the vicinity of the works shall be protected during the course of the refurbishment works. e) All repair of original fabric shall be scheduled and carried out by appropriately experienced conservators of historic fabric. f) The architectural detailing and materials in the new work shall be executed to the highest standards so as to complement the setting of the protected structure and the historic area. Reason: To ensure that the integrity of this protected structure is maintained and that the proposed repair works are carried out in accordance with best conservation practice with no unauthorised or unnecessary damage or loss of historic building fabric.

Council

Dublin New

Date Validated

27 Mar 2024

Decision Date

02 May 2024

Location
Address

36, Fitzwilliam Place, Dublin 2, D02 TY52

UPRN

31007764

Coordinates

53.333468131430763, -6.253379201379699

Source: Lat and Lng

Quick Info
UID
157339
Reference
2741/21Sub01
Status
Decided and closed
Last Updated
06 Dec 2024