WEB1838/22Sub02

Status: Decided and closed (14 Dec 2023)
Application Details
Description

7. The development shall comply with the following requirements of Drainage Division of Dublin City Council: b) The proposal for the management of surface water as indicated on the drawings submitted is not acceptable. The developer shall submit two revised copies of a detailed site plan to the Drainage Division for written approval. These plans shall be submitted not later than the submission of the commencement notice for the development. c) There is an existing public surface water sewer running through the front of the site. A clear minimum distance of three metres shall be maintained between sewers and all structures on site. The exact location of this pipeline must be accurately determined onsite prior to construction work commencing. No additional loading shall be placed on this sewer. Any damage to it shall be rectified at the developer's expense. A proposed surface water layout shall be submitted to the Drainage Division indicating proposed clearance following site investigations, for written agreement with DCC Drainage Division at the commencement of project.

Council

Dublin New

Date Validated

19 Nov 2023

Decision Date

14 Dec 2023

Location
Address

74, Abbeyfield, Killester, Dublin 5 D05 A3C3

Coordinates

53.376517554521236, -6.201712078062030

Source: Lat and Lng

Quick Info
UID
158563
Reference
WEB1838/22Sub02
Status
Decided and closed
Last Updated
25 Jul 2024