WEB1838/22Sub02
Application Details
Description
7. The development shall comply with the following requirements of Drainage Division of Dublin City Council: b) The proposal for the management of surface water as indicated on the drawings submitted is not acceptable. The developer shall submit two revised copies of a detailed site plan to the Drainage Division for written approval. These plans shall be submitted not later than the submission of the commencement notice for the development. c) There is an existing public surface water sewer running through the front of the site. A clear minimum distance of three metres shall be maintained between sewers and all structures on site. The exact location of this pipeline must be accurately determined onsite prior to construction work commencing. No additional loading shall be placed on this sewer. Any damage to it shall be rectified at the developer's expense. A proposed surface water layout shall be submitted to the Drainage Division indicating proposed clearance following site investigations, for written agreement with DCC Drainage Division at the commencement of project.
Council
Dublin New
Date Validated
19 Nov 2023
Decision Date
14 Dec 2023
Council Website
View on Dublin New websiteLocation
Address
74, Abbeyfield, Killester, Dublin 5 D05 A3C3
Coordinates
53.376517554521236, -6.201712078062030
Source: Lat and Lng
Quick Info
- UID
- 158563
- Reference
- WEB1838/22Sub02
- Status
- Decided and closed
- Last Updated
- 25 Jul 2024