4137/21Sub01
Application Details
Description
6. The developer shall comply with the following requirements of the TII; i. The Luas operator/TII will require 24hr access to Luas infrastructure. Prior to the commencement of development, the developer shall enter into an access and maintenance agreement with TII. ii. The developer shall be responsible for any loss of Luas revenue or any other costs associated with a suspension of passenger services, or alterations to the Luas infrastructure which may arise out of, or as a consequence of, the design, construction or the operation of the development by the development contractors, sub-contractors, their employees or agents or any other related party. Appropriate agreements between TII, Luas Operator and the developer shall be undertaken and completed prior to the commencement of development. iii. The proposed development is located in close proximity to a Luas Line; the applicant should ensure there is no adverse impact on Luas operation and safety. The development shall comply with TII’s 'Code of engineering practice for works on, near, or adjacent the Luas light rail system'. iv. Overhead Conductor System (OCS) poles and / or fixings are located on / or adjacent to the proposed development. Prior to commencement of development, the following plans and details shall be submitted for the written agreement of the planning authority subject to the written agreement of TII: (a) OCS pole protection and safety distances, and / or (b) Existing, temporary and subsequent permanent fixings. The developer shall be liable for all costs associated with the removal and reinstatement of the Luas related infrastructure. v. The development shall ensure no risk of intrusion of people into the OCS danger zone via opening windows, maintenance, cleaning, balconies or terraces. The danger zone is described in TII's 'Code of engineering practice for works on, near, or adjacent the Luas light rail system' defined by a 2.75m offset in all directions from the nearest item of OCS infrastructure. vi. The proposed development is located adjacent to landscape works completed as part of Luas public realm improvements works. Prior to commencement of development, revised plans to complement and reinforce the public realm works including hard and soft landscaping shall be submitted for the written agreement of the planning authority subject to the written agreement of TII. vii. The proposed development falls within the area for an adopted Section 49 Supplementary Development Contribution Scheme - Luas Cross City (St. Stephen’s Green to Broombridge Line) under S.49 Planning and Development Act 2000, as amended. If the above application is successful and is not exempt, please include a condition to apply the Section 49 Luas Line Levy. viii. TII’s ‘Code of engineering practice for works on, near, or adjacent the Luas light rail system is available at https://www.luas.ie/work-safety-permits.html. Reason: To ensure a satisfactory standard of development.
Council
Dublin New
Date Validated
24 Aug 2023
Decision Date
09 Oct 2023
Council Website
View on Dublin New websiteLocation
Address
Site at Gaelscoil Cholaiste Mhuuire located on the eastern side of Dominick Street Lower, at the junction of Dominick Street Lower and Dominick Place, Dublin 1
Coordinates
53.352230427093254, -6.266880148629430
Source: Lat and Lng
Quick Info
- UID
- 157226
- Reference
- 4137/21Sub01
- Status
- Decided and closed
- Last Updated
- 15 May 2024