WEB2145/22Sub01

Status: Decided and closed (29 Jun 2023)
Application Details
Description

3. The applicant shall comply with the following requirements of the DCC Drainage Division: (a) The drainage for the proposed development shall be designed on a completely separate foul and surface water system with a combined final connection discharging into Irish Water’s combined sewer system. (b) The development shall incorporate Sustainable Drainage Systems in the management of surface water. (c) Any new paving shall be carried out in a sustainable manner so that there is no increase in surface water run-off to the drainage network as per the Dublin City Development Plan 2022-2028. Details of (b) and (c) above shall be agreed in writing with the Planning Authority prior to commencement of construction. (d) All private drainage such as, downpipes, gullies, manholes, armstrong junctions, etc. are to be located within the final site boundary. Private drains should not pass through property they do not serve. Reason: To prevent excess surface water run-off into the public water system, and to implement natural SuDs solutions in accordance with the City Development Plan.

Council

Dublin New

Date Validated

19 Jun 2023

Decision Date

29 Jun 2023

Location
Address

189, Botanic Avenue, Dublin 9 D09 X5T6

Coordinates

53.368423353725952, -6.260077939410980

Source: Lat and Lng

Quick Info
UID
156237
Reference
WEB2145/22Sub01
Status
Decided and closed
Last Updated
07 Feb 2024