WEB2145/22Sub01
Application Details
Description
3. The applicant shall comply with the following requirements of the DCC Drainage Division: (a) The drainage for the proposed development shall be designed on a completely separate foul and surface water system with a combined final connection discharging into Irish Water’s combined sewer system. (b) The development shall incorporate Sustainable Drainage Systems in the management of surface water. (c) Any new paving shall be carried out in a sustainable manner so that there is no increase in surface water run-off to the drainage network as per the Dublin City Development Plan 2022-2028. Details of (b) and (c) above shall be agreed in writing with the Planning Authority prior to commencement of construction. (d) All private drainage such as, downpipes, gullies, manholes, armstrong junctions, etc. are to be located within the final site boundary. Private drains should not pass through property they do not serve. Reason: To prevent excess surface water run-off into the public water system, and to implement natural SuDs solutions in accordance with the City Development Plan.
Council
Dublin New
Date Validated
19 Jun 2023
Decision Date
29 Jun 2023
Council Website
View on Dublin New websiteLocation
Address
189, Botanic Avenue, Dublin 9 D09 X5T6
Coordinates
53.368423353725952, -6.260077939410980
Source: Lat and Lng
Quick Info
- UID
- 156237
- Reference
- WEB2145/22Sub01
- Status
- Decided and closed
- Last Updated
- 07 Feb 2024