3622/21Sub04

Status: Decided and closed (17 Apr 2023)
Application Details
Description

11. The developer shall comply with the following requirements of Transport Infrastructure Ireland: All deliveries made to the development site, including during the construction phase, shall be made to limit interference with Luas operations. Prior to commencement of development, a Demolition and/or Construction Method Statement shall be submitted for the written agreement of the planning authority subject to the written agreement of TII. The method statement shall resolve all Luas interface issues and shall (i) identify all Luas alignment interfaces, (ii) contain a risk assessment for works associated with the interfaces, and (iii) contain mitigation measures for unacceptably high risks, including vibration and settlement monitoring regime if necessary The applicant is required to comply with the Code of Engineering Practice for works on, near or adjacent to the Luas Light Rail system. The Code is available to view at https://www.luas.ie/work-safety-permits.html Reason: To ensure there is no adverse impact on Luas operations and safety concerns.

Council

Dublin New

Date Validated

22 Mar 2023

Decision Date

17 Apr 2023

Location
Address

Blocks 3A and 3B of the Irish Life Centre (and their associated garden areas) at the Irish Life Centre, 1 Abbey Street Lower, Dublin 1, D01 PK03.

Coordinates

53.349719362834847, -6.256124037266139

Source: Lat and Lng

Quick Info
UID
154833
Reference
3622/21Sub04
Status
Decided and closed
Last Updated
18 Nov 2023