SHD0020/20Sub21
Application Details
Description
17. The construction of the development shall be managed in accordance with a final Construction Management Plan, which shall be submitted to, and agreed in writing with, the planning authority prior to commencement of development. This plan shall provide details of intended construction practice for the development, including: (a) Works to remove trees and structures from the site shall take place outside of bird nesting season; (b) During the removal of structures from the site, the adoption of mitigation measures outlined in the approved Bat Roost Assessment and Survey Report for the application; (c) Noise management measures; (d) Location of the site and materials compound(s) including area(s) identified for the storage of construction refuse; (e) Location of areas for construction site offices and staff facilities; (f) Details of site security fencing and hoardings; (g) Details of on-site car parking facilities for site workers during the course of construction; (h) Details of the timing and routing of construction traffic to and from the construction site and associated directional signage, to include proposals to facilitate the delivery of abnormal loads to the site; (i) Measures to obviate queuing of construction traffic on the adjoining road network; (j) Measures to prevent the spillage or deposit of clay, rubble or other debris on the public road network; (k) Alternative arrangements to be put in place for pedestrians and vehicles in the case of the closure of any public road or footpath during the course of site development works; (l) Details of appropriate mitigation measures for noise, dust and vibration, and monitoring of such levels; (m) Containment of all construction-related fuel and oil within specially constructed bunds to ensure that fuel spillages are fully contained. Such bunds shall be roofed to exclude rainwater; (n) Off-site disposal of construction or demolition waste and details of how it is proposed to manage excavated soil; (o) Means to ensure that surface water run-off is controlled such that no silt or other pollutants enter local surface water sewers or drains; (p) A record of daily checks that the works are being undertaken in accordance with the Construction Management Plan shall be kept for inspection by the planning authority. Reason: In the interest of amenities, public health and safety.
Council
Dublin New
Date Validated
06 Mar 2023
Decision Date
22 Feb 2023
Council Website
View on Dublin New websiteLocation
Address
The Old Glass Factory at rear 113-115 Cork Street; No. 118 Cork Street and lands at rear; No. 119, 120, 121, 122 Cork Street, all with adjoining lands to the rear; No. 56 John Street South and adjacent laneway, Dublin 8 (ABP-308162-20)
Coordinates
53.338488559176660, -6.282901728907877
Source: Lat and Lng
Quick Info
- UID
- 153905
- Reference
- SHD0020/20Sub21
- Status
- Pending
- Last Updated
- 16 Nov 2025