LA11/2024/0491/F

Status: Refused (08 Aug 2025)
Application Details
Description

Proposed new 33kV Network consisting of both overhead line on a wooden pole type construction and underground cable. The overhead line total route length is approximately 13.83km and the underground cable 4.67km. The total route length is 18.5km all within the Derry & Strabane Council area

Council

Derry Strabane

Application Type

Full

Date Received

05 Jun 2024

Date Validated

12 Jun 2024

Decision Date

08 Aug 2025

Location
Address

Commencing approx. 55 M. East of 87 Woodend Road, Ballymagorry, Co. Tyrone, BT82 0AF to 234 M. East of 66 Letterbratt Road, Letterbrat, Plumbridge, Co. Tyrone, BT79 8DN crossing through the townlands of Woodend, Milltown, Ballee, Holly-Hill, Dergalt. Evish, Keenaghan, Owenreagh, Ligfordrum, Ballynasollus, Meenagorp, Crucknaclady, Meenagarragh, Glashygolgan & Letterbrat

Postcode

BT82 0AF

Coordinates

54.806777288482039, -7.361463499701939

Source: Lat and Lng

Quick Info
UID
688936
Reference
LA11/2024/0491/F
Status
Refused
Last Updated
06 Nov 2025