LA11/2022/1171/DC

Status: Granted
Application Details
Description

Discharge of Condition: 2 of LA11/2021/0186/F 2. No development shall commence on site (including demolition, site clearance and site preparation) unless a final Construction and Environmental Management Plan has been submitted by the appointed contractor to the planning authority and approved in writing by Council. The CEMP shall include the following: a) Construction methodology and timings of works; b) Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c) Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d) Spoil Management Plan; including identification of spoil storage areas, management and handling of spoil and details of the reinstatement of excavated soil; e) Water Quality Monitoring Plan; f) Environmental Emergency Plan; g) Details of the appointment of an Ecological Clerk of Works (ECoW) and their roles and responsibilities. h) identify all potential risks to the adjacent watercourses and must incorporate all of the pollution prevention measures included in the Outline Construction Environmental Management Plan stamped 03/05/2022 and all details requested by NIEA NED in their consultation response dated 20/06/2022. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Planning Authority. Reason: To ensure the project will not have an adverse effect on the integrity of any European site and to protect Northern Ireland priority habitats and species, to ensure implementation of mitigation measures identified within the Environmental Statement and to prevent likely significant effects on the River Faughan and Tributaries SAC/ASSI.

Council

Derry Strabane

Application Type

Discharge of Condition

Date Received

12 Dec 2022

Date Validated

06 Jan 2023

Location
Address

Woodland Trust, Red Brae, Lands 675m NNW of 90 Ardground Road Kilalloo Londonderry BT47 3TB

Postcode

BT47 3TB

Coordinates

54.936673276886729, -7.218899129900311

Source: Lat and Lng

Quick Info
UID
665183
Reference
LA11/2022/1171/DC
Status
Granted
Last Updated
12 May 2023